How to Mark For Additional Floor Concession in Nala/Road Widening
Tutorial Video
Steps
-
Select between Setback Concession/Transfer of Setbacks case
- Click on Guided Marking. If two Site Plans are present in the drawing, then the Setback Concession/Transfer of Setbacks window opens.
- From the dropdown, select "CONCESSION_FOR_ROAD_OR_NALA_WIDENING".
-
Mark After Road/Nala Widening Concession Site Plan
- Search for the "Site Plan" that represents the Site Plan After Concession. Site Plan Type form appears on the right side of the screen.
- Select "AFTER_CONCESSION" from the dropdown.
- Click "Save and Next Unmarked".
- Provide the data for the Proposed Work in the AFTER_CONCESSION site plan:
- Proposed Work Type
- Proposed Work Number
- Click "Save and Next Unmarked".
-
Mark Before Road/Nala Widening Concession Site Plan
- Search for the "Site Plan" that represents the Site Plan Before Concession. Site Plan Type form appears on the right side of the screen.
- Mark Site Plan For as "BEFORE_CONCESSION" from the dropdown.
- Click "Save and Next Unmarked".
- Provide the data for the Proposed Work in the BEFORE_CONCESSION site plan:
- Proposed Work Type
- Proposed Work Number
- Click "Save and Next Unmarked".
-
Map After Proposed Work to Corresponding Before Proposed Work
- Select "Before and After Proposed Work Mapping" section.
- You can see After Proposed Work is highlighted in the drawing.
- Tick the checkbox against the corresponding Proposed Work in the "Before Proposed Works" section to map with the selected After proposed work.
- Click "Save and Next Unmarked".
-
Mark Floor in Section
- Navigate to the floor in section which is the additional floor being availed.
- In Additional Permissible Floor Category select either ROAD_CONCESSION or NALA_CONCESSION
Checkpoints
- Ensure that there are two Site Plans -
- One for Before Concession.
- One for After Concession.
Drawing Conventions
- Ensure that 2 site plans are present outside the
__BN_BuildingPlan
Layer.